top of page

TEKNOVA IMAGING

ROLE:
GENERAL CONTRACTOR
The exterior is made up of ground face masonry block, metal panels and aluminum curtainwall. As experienced general construction contractors, we are committed to delivering top-quality services. The first floor has a large open floor plan dedicating to the manufacturing of the Kubtec X-Ray machines. The second floor includes executive offices, a full kitchen/collab area as well as a training and conference room.
Location
Building Size
Owner
Role
Schedule
111 Research Drive, Stratford
20,000 SF
Kub Technologies
General Contractor, MEP Design Builders
12 months
Project Cost
$3,500,000
bottom of page

